Overcoming Installation Challenges to Reduce Energy Costs
The Old Barracks
Background
Located in Sheffield city centre, The Old Barracks is home to multiple businesses, each with significant energy needs. The building owner sought to offset electricity costs by leveraging the available roof space for a solar PV installation, making the property more energy-efficient and sustainable.
The Challenge
While the building had suitable roof space, the steep pitch of the roof presented a significant challenge for installation. Ensuring safe and secure panel placement while maximising energy generation required careful planning and execution. Additionally, with multiple businesses operating in the building, minimising disruption during the installation process was a key priority.
The Solution
To overcome the installation challenges, Grid Neutral designed a custom solar PV system tailored to the building’s structure and energy consumption. Our team successfully installed 150 solar panels, totalling 67kW, while implementing safety measures to account for the challenging roof pitch.
Results
With the 67kW system in place, The Old Barracks is now expected to reduce its electricity bill by 44%, significantly cutting energy costs for the businesses operating within the building. The installation not only improves financial savings but also supports sustainable energy usage in the heart of Sheffield.
Grid Neutral Can Help You Reduce Your Energy Costs
At Grid Neutral, we design and deliver solar solutions that meet strict operational and sustainability requirements, helping businesses cut costs and reduce their carbon footprint.
With our expertise in solar panel installations, our clients trust us to provide an efficient process from planning to completion. Get in touch today to explore how we can help you transition to clean energy and improve your long-term savings.